The first public announcement of environmental impact assessment for upgrading and revamping of 2 75 ton boiler in Weifang Binhai Petrochemical Co., Ltd.

    According to the relevant requirements of the Interim Measures for public participation in environmental impact assessment, public participation in the environmental impact assessment of Weifang Binhai Petrochemical Company Limited "2 75 ton boilers upgrading project" will be publicized, so that the construction of the project may affect the public's understanding of the construction of the items in the area, and publicize the attitude and suggestions of the public to this project. Accept the supervision of the public.

I. The name and outline of the construction project

1. Project name: upgrading project of 2 75 ton boiler.

2, the nature of Construction: technological transformation

3. Construction site: Weifang Binhai Economic Development Zone, south of Xinhai street, north of Xinghai street, east of Haifeng road.

4. General situation of the project: upgrading the existing 2 x 75t/h CFB boiler. Change the original coal cinder open storage, increase 400m Three A slag bin, a matching bucket elevator, an electric pulse bag filter, an unloader and so on. The original SNCR denitration device is retrofit, and the low nitrogen combustion +SNCR method is combined to remove the nitrate. Specifically, the transformation of the primary air distributor, wind cap, and the number and location of the two air outlets, the location of the economizer is transformed (the reserved location for the SCR denitration), and the original desulfurization device is retrofit. Calcium method wet desulphurization], instead of limestone (calcium carbonate) furnace desulfurization + limestone wet flue gas desulfurization combined desulfurization, the specific transformation content is new plus 150m. Three A limestone tank in the furnace is desulphurized, 200m added. Three Wet desulphurization limestone tank one, desulfurization tower spray layer from the original 3 to 5, 60 meters high. Three point two There are 1 rice FRP chimneys. The original electrostatic precipitator is replaced by electrostatic precipitator + wet electric dust removal combined dust collector, new wet electrostatic precipitator and so on, and 1 new water treatment systems are added.

Two, the name and contact method of the project construction unit.

Project construction unit: Weifang Binhai Petrochemical Co., Ltd.

Address: Weifang Binhai Economic Development Zone, south of Xinhai street, north of Xinghai street, east of Haifeng road.

Contact: Li Chuangang: 0536-2103297

Mailbox: Lichg@mt3dcn.com

Three. The name and contact method of the environmental impact assessment agency undertaking evaluation work.

EIA unit: Weifang Fu Di run Da Environmental Engineering Co., Ltd.

Address: No. 6789, democratic Street, Weifang economic development zone.

Contact: Chen Gong telephone number: 13046466159

E-mail: 954042615@qq.com

Four. Working procedures and main contents of environmental impact assessment

1, through on-site investigation, understand the surrounding environment of the proposed project and collect relevant engineering and environmental information. According to the technical guidelines, the report will be compiled and submitted for examination and approval.

2, in accordance with the relevant laws and regulations and technical guidelines of the People's Republic of China Environmental Impact Assessment Act, make full use of the existing technical information and combine with the project situation to carry out the environmental status assessment and environmental impact prediction and evaluation of the project construction area. The environmental impact assessment work of the proposed project will be based on engineering analysis. The emphasis should be laid on the environmental air impact assessment, water environmental impact assessment, pollution control measures, environmental risk assessment and environmental risk assessment during the operation period. At the same time, practical measures and countermeasures are put forward to ensure the public interest, to realize the harmony between project construction and environmental protection, and to achieve the unification of the three benefits.

Five, the main matter of soliciting public opinions

1. What are the opinions and requirements for the construction of this project?

2. What are the suggestions or requirements for environmental protection during the operation period of this project?

3. Environmental concerns and concerns about the operation of this project;

4. What are the requirements for construction units and evaluation units?

Six, publicity instructions

You can send letters or phone calls, send text messages, send e-mail and other ways to put forward suggestions from individuals, departments and units. For further understanding of the project, please contact the contact of the construction unit or the EIA unit.

It is hereby indicated that any unit or individual may contact us if there is any valuable suggestion or suggestion. This announcement is valid within ten days from the date of publication.

 

 

 

Weifang Binhai Petrochemical Co., Ltd.

June 24, 2019

 