Weifang Binhai Petrochemical Co., Ltd. "Baili chemical ester products relocation and upgrading project" environmental impact assessment second information publicity

The environmental impact statement (Draft) has been completed by the Weifang Binhai Petrochemical Company Limited. The public opinion on the environmental impact of the construction project is now open to the public.

I. Basic Situation of construction projects

Project Name: the relocation and upgrading project of the chemical products of Baili Chemical Co., Ltd.

Construction unit: Weifang Binhai Petrochemical Co., Ltd.

Legal representative: Xiao Liping

Nature of Construction: relocation of new buildings

Construction contents: the company intends to relocate the existing chemical production plant of Weifang Baili Chemical Co., Ltd. to Weifang Binhai petrochemical company. After the relocation, the production capacity of cyanoacetic acid ethyl ester can be increased from 20 thousand t/a to Three point five 000 t/a (of which cyanoacetic acid ethyl ester [ECA]2 10000 t/a, methyl cyanoacetate [MCA]) One point five 000 t/a); the corresponding capacity of sodium cyanide can be relocated, and the capacity after relocation is still 30 thousand t/a. The production capacity is increased from 60 thousand t/a to 30% CAA, 70%. Seven point three 000 t/a; new 1, 1- cyclohexyl two acetic acid (CDA) production plant, 1, 1- cyclohexyl two acetic acid monamide (CAM) production plant, ammonium sulfate production plant each set. Project matching new processing capacity is 2000m Three /d set up a set of sewage treatment facilities, incineration capacity of 6000t/a hazardous waste incineration device. After the completion of the project, the annual output of liquid sodium cyanide is 30000 tons (100%), 70% cyanoacetic acid (CAA) 73000 tons, methyl cyanoacetate (MCA) 15000 tons, ethyl cyanoacetate (ECA) 20000 tons, 1, 1- cyclohexyl two acetic acid (CDA) 3500 tons, 1, 1- cyclohexyl two acetic acid monamide (CAM) 3000 tons, by-product acetic acid. One thousand eight hundred and seventy point two two The scale of tons.

Construction site: Weifang Binhai Economic Development Zone, north of Xiang Jiangxi street, west of Haifeng road.

Two. Ways and means to link up the full text of the draft environmental impact report and to consult paper reports.

Make a good environmental impact statement ( Draft for comments (see) Annex 1.

Paper version of the environmental impact statement ( Draft for comments Deposited in the reception room of Weifang Binhai Petrochemical Company Limited, the public can visit it.

Three. Public scope of soliciting opinions

It is mainly citizens, legal persons and other organizations within 5 kilometers around the site of the project.

Four. The network connection of the public opinion list.

Public opinions on environmental impact assessment of construction projects Annex 2.

Five, ways and means of public opinion.

The public can submit opinions or advice to the construction unit through telephone, letter, e-mail or directly to the work unit. The contact is as follows:

Construction unit: Weifang Binhai Petrochemical Co., Ltd.

Contact address: Weifang Binhai Economic Development Zone, north of Xiang Jiangxi street, west of Haifeng road.

Contact: Li Chuangang

Contact number: 18853656997

Mailbox: Lichg@mt3dcn.com

Six, the starting and ending time of public opinion.

10 days from the date of public notice.

 

 

Weifang Binhai Petrochemical Co., Ltd.

June 24, 2019

 

Annex 1: environmental impact statement ( Draft for comments )

Additional 2: public opinion list for environmental impact assessment of construction projects

 
亿电竞 Holdings Limited Copyright (C) 2016 network support China Chemical Network Global chemical network Copyright statement Contact number: 0536-2103200
Record number: Lu ICP 15001174. Public security record No. 37079202000008