Weifang Binhai Petrochemical Company Limited 2 sets of 75 ton boiler upgrading project environmental impact assessment second publicity

 

    According to the relevant requirements of the Interim Measures for public participation in environmental impact assessment, public participation in the environmental impact assessment of the upgrading project of 2 litre Petrochemical Company Limited of Weifang Binhai Petrochemical Company Limited has been carried out for the first time. The project has been publicized for the first time, and the project has been publicized for second times, so that the project construction may affect the public's understanding of the project's construction in the area. Understand and publicized the attitude and suggestions of the public to this project and accept the supervision of the public.

I. General Situation of construction projects

1. Project name: upgrading and upgrading project of 2 litre 75 ton boiler of Weifang Binhai Petrochemical Co., Ltd.

2, construction nature: technical transformation

3. Construction site: Weifang Binhai Economic Development Zone, south of Xinhai street, north of Xinghai street, east of Haifeng road.

4. General situation of the project:

The scale of construction will upgrade the existing 2 x 75t/h CFB boiler. Change the original coal cinder open storage, increase 400m Three A slag bin, a matching bucket elevator, an electric pulse bag filter, an unloader and so on. The original SNCR denitration device is retrofit, and the low nitrogen combustion +SNCR method is adopted to unite the denitration. The transformation of the primary air distributor, the wind cap and the number and location of the two air outlets, the transformation of the economizer location and the installation of the SCR denitration device are carried out. Wet desulphurization], replaced by limestone (calcium carbonate) furnace desulfurization + limestone wet flue gas desulfurization combined desulfurization, the specific transformation content is new plus 150m Three A limestone tank in the furnace is desulphurized, 200m added. Three Wet desulphurization limestone tank one, desulfurization tower spray layer from the original 3 to 5, 60 meters high. Three point two There are 1 rice FRP chimneys. The original electrostatic precipitator is replaced by electrostatic precipitator + wet electric dust removal combined dust collector, new wet electrostatic precipitator and so on, and 1 new water treatment systems are added.

Two, the possible impact of construction project operation period on the environment and preventive measures

1. Main pollutants:

(1) wastewater: the main waste water is production wastewater and domestic sewage; (2) exhaust gas: coal burning waste gas, limestone silo dust and so on; (3) noise: mainly for workshop matching exhaust fan, air compressor, boiler equipment and other noise; (4) solid waste: bag dust collector collecting dust, boiler ash, desulfurization gypsum and domestic waste.

2, environmental impact and preventive measures

1) exhaust gas

The main links of air pollution during the project operation period are: smoke and dust produced by 2 coal-fired boilers, and SO Two NOx, mercury and its compounds, air blackness and other air pollutants.

2 coal-fired boilers are planned to share 1 60m chimneys, and 2 boilers are equipped with "electrostatic precipitator + desulphurization + limestone gypsum method desulphurization +SNCR denitration +SCR denitration" flue gas treatment facilities. According to the analogy analysis, the design efficiency of cloth bag dedusting is 99%, the desulphurization and dust removal efficiency outside the furnace is 50%, and the comprehensive dedusting efficiency is 99.95% The efficiency of wet desulphurization is about 98%, and the denitration efficiency of SNCR+SCR denitration process is 60%.

According to the design data of the project, the height of the highest building is less than 20 m within the radius of 200 m, so the chimney height of the project meets the relevant requirements.

The limestone powder is transported and stored in a closed way. It is airtight and conveyed. The bag top dust collector is arranged on the top of the storehouse. The dust is discharged by the exhaust pipe of 15 meters high. The fly ash adopts dilute phase pneumatic ash removal system. When the ash discharging port is discharged, the closed transportation system and the tanker loading and unloading transportation are used. The ash is closed tightly, and the top is equipped with bag dust remover, and the dust is discharged by a 15 meter high exhaust cylinder.

In addition, this project inevitably produces exhaust emissions without organization. The main links are coal feeding and transportation process, slag transportation and loading and unloading, coal storage using totally closed coal storehouse, and sprinkling water facilities, and a small amount of dust is discharged in unorganized form.

2) wastewater

    The wastewater produced by the proposed project includes domestic sewage and production wastewater. The production wastewater mainly includes chemical water treatment sewage, boiler effluent, desulphurization wastewater, wet electrostatic precipitator wastewater, circulating cooling water, and so on. Boiler drainage, desulfurization wastewater, wet electrostatic precipitator wastewater and circulating cooling water drainage are used for coal yard spraying. After treatment, the B grade standard in Table 1 of sewage quality standard for discharge into urban sewers (GB/T31962-2015) has been discharged into the Weifang BofA sewage treatment plant through the municipal pipe network. The BofA sewage treatment plant in Weifang has implemented the "A standard for pollutant discharge standards of municipal sewage treatment plants" (GB18918 - 2002), and the effluent is discharged to Cui Jiahe river.

3) noise

The noise level of the project boundary meets the 3 standard requirements of the environmental noise emission standard for industrial enterprises (GB12348-2008), which has little effect on the noise generated by the surrounding environment.

4) solid waste

The waste generated by construction projects is mainly domestic waste, waste cloth bags, furnace ashes, slag, desulfurized gypsum and waste lubricating oil. According to the calculation, the annual output of the proposed project is about 30%. 56222.4t/a Slag production 15755.6t/a Desulphurization gypsum 5926.2t/a All the ash, slag and desulphurized gypsum are comprehensively utilized by the truck to the building materials company. The comprehensive utilization rate is 100%. 10.2t All the domestic refuse is handled by the local environmental sanitation department and transported to Weifang garbage disposal site for harmless treatment. The equipment maintenance produces waste mineral oil. 0.058t/ In 2003, it was a hazardous waste (HW08: 900-249-08), and the amount of waste activated carbon produced. 0.5t/a It belongs to hazardous waste, hazardous waste code HW49 900-041-49, the annual output of waste ion exchange resin. 0.2t/a It belongs to hazardous waste, hazardous waste code HW13 900-015-13, entrusted by qualified units.

Solid waste is harmless and resources are realized. It also brings certain economic benefits while protecting the environment.

Three, the key points of the environmental impact assessment conclusions put forward by the environmental impact statement.

The construction of the project is in line with the state's industrial policy, and the location is reasonable, the products can meet the market demand, and the economic benefits are remarkable, which is conducive to the development of enterprises and local economy. The construction units should seriously implement the various control measures and environmental protection proposals put forward in the evaluation. After the operation of the project, the waste gas, waste water and noise generated by the environmental protection measures will not have a significant impact on the surrounding environment and sensitive targets. From the perspective of environmental protection, this evaluation considers that the site selection and construction of the project is feasible.

Four. Public participation

The project publicized the content of the project through the website of Weifang Binhai Petrochemical Company Limited, so as to let more public understand the construction of the project.

Five, environmental risk analysis

The project does not constitute a major hazard source. Emergency measures are designed according to the regulations. As long as strict compliance with the safety regulations and regulations, and strengthening safety management, the environmental risk is acceptable at this level after the project is put into operation.

Six. Public consultation channels

The project is publicized online, and is conducted through the website of Weifang Binhai Petrochemical Company Limited. The public can obtain supplementary information, environmental impact report (simplified version) or publish comments and comments on the EIA work of the construction unit or its entrusted environmental impact assessment agency by sending letter, fax, e-mail to the designated address. The specific links are as follows:

1, the scope and main matters of soliciting public opinions.

This project mainly solicited the scope of public opinion: the relevant people near the site of the project.

The main issues of public consultation are:

(1) from the perspective of environmental protection, what attitude do you have towards the construction of this project?

(2) from the perspective of environmental protection, your comments and suggestions on this project;

(3) what specific suggestions do you have for the construction of this project?

2, the starting time of public opinion: within 10 working days from the date of promulgation.

3. Construction units and EIA units

Project construction unit: Weifang Binhai Petrochemical Co., Ltd.

Address: Weifang Binhai Economic Development Zone, south of Xinhai street, north of Xinghai street, east of Haifeng road.

Contact: Li Chuangang: 0536-2103297

Mailbox: Lichg@mt3dcn.com

Three. The name and contact method of the environmental impact assessment agency undertaking evaluation work.

EIA unit: Weifang Fu Di run Da Environmental Engineering Co., Ltd.

Address: No. 6789, democratic Street, Weifang economic development zone.

Contact: Chen Gong telephone number: 13046466159

E-mail: 954042615@qq.com

The legality and authenticity of the contents of the project are responsible for the construction units and EIA units.

 

 

 

Weifang Binhai Petrochemical Co., Ltd.

Two 0 19 July 8th

 

Annex 1: Environmental impact report of 2 75 ton boiler upgrading project (Draft)

Annex 2: Public opinion list of environmental impact assessment for construction projects

 
亿电竞 Holdings Limited Copyright (C) 2016 network support China Chemical Network Global chemical network Copyright statement Contact number: 0536-2103200
Record number: Lu ICP 15001174. Public security record No. 37079202000008