Weifang Binhai Petrochemical Co., Ltd. "70 thousand tons / year (discount 100) liquid sodium cyanide plant tail gas environmental protection comprehensive utilization project" environmental impact assessment second information publicity

I. Basic Situation of construction projects

Project Name: comprehensive utilization project of 70 thousand tons / year (waste 100) liquid sodium cyanide plant tail gas treatment

Project nature: technical transformation

Location: Weifang Binhai Economic Development Zone, No. 001001 Xiang Jiangxi street, Binhai Petrochemical area.

Construction content and scale: the project covers an area of 17812.5 square meters with a total construction area of 2632 square meters. 1 sets of process facilities for the production of synthetic ammonia and high purity hydrogen are comprehensively controlled. The main building structures include compressor room, cabinet room and distribution room, exhaust purification area, methanation plant area, ammonia synthesis plant area, PSA nitrogen plant area, PSA hydrogen extraction device area, circulating machine shed, ammonia washing deoxidization desulfurization device area, etc. Newly purchased equipment: raw material gas compressor, oil removal tower, washing tower, crude desulfurization tower, fine desulfurizer, deaerator, recycle compressor, adsorption tower, product gas buffer tank, vacuum pump, PSA nitrogen production system, methanation heating furnace, methanation reactor, hydrogen nitrogen compressor, ammonia synthesis tower, ammonia waste heat boiler, deflation buffer tank, desorption gas mixing tank, and reverse gas release Equipment such as flushing tank, desulfurizing cooler, deoxidizer, gas liquid separator, methanation cooler, methanation separator, tower heat exchanger and so on. The annual production of ammonia is 25 thousand tons, and the annual hydrogen production is 4 million 800 thousand Nm. Three Annual production capacity of ammonia (8%) 2580 tons.

Two, main pollution factors and prevention measures of construction projects

1, waste water

After the completion of the proposed project, the waste water is divided into domestic sewage, chemical and chemical analysis wastewater, equipment, surface washing water, initial rainwater, circulating cooling sewage, soft water station drainage and tail gas incineration system drainage, etc. the total amount of wastewater generated is 10007.84m Three /a. The domestic sewage is treated by septic tank, and then the sewage, equipment, surface washing water, initial rainwater, circulating cooling sewage, soft water station drainage and tail gas incineration system are collected for sewage treatment. The sewage treatment station is located on the northwest side of the plant, and the scale is 2000m. Three /d. The combination of physical chemistry and biochemistry was used to process the technology. The effluent quality of the sewage treatment station meets the requirements of Weifang BofA water treatment company limited sewage treatment acceptance agreement, and is processed by Weifang BofA water treatment Co., Ltd.

In summary, the wastewater from the proposed project can meet the standard discharge and is acceptable to the local surface water.

2. Exhaust gas

The exhaust gas generated during the operation of the proposed project mainly includes PSA purification unit G1 analytical gas, ammonia synthesis and separation unit G3 flash steam, PSA hydrogen extraction unit analytical gas G4, natural gas combustion waste gas G2, sewage treatment waste gas.

PSA purification unit G1 analytical gas, ammonia synthesis and separation unit G3 flash steam, PSA hydrogen unit analytical gas G4, these three exhaust gas collection, relying on "Weifang littoral Petrochemical Co., Ltd." Baili chemical ester products relocation upgrading project "2 * 14t/h waste heat steam boiler (without natural gas and other fuels combustion) incineration + tail gas SCR denitration treatment +35 +35 high exhaust gas H24 treatment, exhaust cylinder H 24 the emission rate of ammonia can meet the two level standard requirements (emission rate 27kg/h) of Table 2 of the odor emission standard (GB14554-93), and the concentration of hydrogen cyanide meets the sixth part of the VOC emission standard in Shandong: the organic chemical industry (DB37/ 2801.6-2018) 2 standard (emission concentration 1.9mg/m). Three The discharge rate can meet the 2 level standard requirements (emission rate 0.57kg/h) of Table 2 of the comprehensive emission standard for atmospheric pollutants (GB16297-96), and the concentration of particulate matter, nitrogen oxides and sulfur dioxide can meet the standard requirements of the "key control area" in Table 2 of the atmospheric pollutant discharge standard for boiler (DB37 2374-2018) (emission concentration). Particulate matter 10mg/m Three Nitrogen oxides 100mg/m Three Sulfur dioxide 50mg/m Three The discharge rate can meet the 2 level standard requirements (emission rate particulate matter 31kg/h, nitrogen oxide 5.3kg/h and sulfur dioxide 20kg/h) in Table 2 of the comprehensive emission standard for atmospheric pollutants (GB16297-96).

The waste gas from sewage treatment station relies on the existing waste gas treatment measures, and the exhaust gas generated by the three-phase separator under the anaerobic pond is mainly H. Two S, NH Three The other substances were treated by 1 lye spray towers and discharged through the H8 of the existing sewage treatment station exhaust. The regulating tank, anaerobic tank, aerobic tank, sludge concentration tank, sludge pressure filter room and sludge drying equipment are closed. The exhaust gas is treated by 1 alkali liquor spray absorption towers and discharged through the H9 of the existing sewage treatment station exhaust cylinder. The types of pollution to be controlled by H8 and H9 are H Two S, NH Three Odor concentration. The concentration of H2S, ammonia and odors emitted from the two exhaust cylinders (equivalent exhaust H8/H9) of the sewage treatment plant meets the standard requirements of DB37/3161-2018 Table 1 of the VOCs and odor pollutants of the sewage treatment plants (stations) of the sewage treatment plant after the discharge of pollutants from the project superimposed on the existing works. (H2S emission concentration 3mg/m Three The emission rate is 0.1kg/h; the ammonia emission concentration is 20mg/m Three The emission rate is 1.0kg/h; the odor concentration is 800 (dimensionless).

This EIA has taken corresponding control measures for the above exhaust gas. After taking measures, all air pollutants can be discharged to meet the standards. The measures are feasible and have little influence on the ambient air environment and are at an acceptable level.

In summary, the exhaust gas produced by this project will not affect the atmospheric environment after taking corresponding measures.

3. Noise

The main noise of the project comes from the mechanical and dynamic noise and aerodynamic noise generated by various chemical pumps, centrifuges, air blower and drying systems. The noise source is strong at 70 ~ 85dB (A). Through the selection of low noise equipment, regular maintenance and maintenance, installation of mufflers, noise isolating hood, foundation vibration reduction and greening and noise reduction, the noise level of factory boundary meets the 3 standard requirements of environmental noise emission standard for industrial enterprises (GB12348-2008).

4. Solid waste

This project includes solid waste including PSA nitrogen link, PSA purification unit, and waste sorbent produced by PSA hydrogen extraction unit, except for spent activated carbon from ammonia washing and ammonia synthesis and separation links, desulphurization and deoxygenation links, methanation links, ammonia synthesis and separation links and SCR denitrification loop waste catalyst, sewage treatment station sludge, soft water station waste reverse osmosis membrane and workers' life. The domestic waste, sewage treatment station sludge, oil and waste activated carbon, methanation waste catalyst, SCR discarded waste catalyst and so on are hazardous wastes. Sewage treatment station sludge and waste activated carbon are sent to the existing hazardous waste incinerator incineration. Methanation waste catalyst, SCR discarded waste catalyst entrusted by hazardous waste treatment qualification units; PSA purification, PSA hydrogen production of waste sorbent, deoxygenation desulfurization, ammonia synthesis and separation of waste catalyst, need to be solid waste or hazardous waste identification, before the conclusion of the identification is clear, according to the management of hazardous waste, collected and stored in the existing hazardous waste repository. After the identification conclusion is clear, according to the identification conclusion and suggestion, disposal / disposal or comprehensive utilization. PSA waste nitrogen adsorbent and waste water reverse osmosis membrane at soft water station are solid waste. Municipal solid waste is temporarily stored in the garbage bin, and is uniformly transported by the local sanitation department. The solid waste generated by the proposed project is disposed of according to the disposal principle of "resource reduction, reduction and harmlessness", and all solid waste of the project is rationally utilized. The solid waste generated by the project is properly disposed of. General solid waste storage meets the relevant requirements of the general industrial solid waste storage and disposal site pollution control standard (GB18599-2001) and its amendment list, and the storage of hazardous wastes meets the requirements for hazardous waste storage pollution control standard (GB18597-2001) and its amendment list.

In accordance with the relevant regulations of the state and the province, the project implements various solid waste collection, disposal and comprehensive utilization measures. Solid waste can be disposed of effectively and will not cause two pollution to the environment.

Three. Ways and means to link up the full text of the draft environmental impact report and to consult paper reports.

Our company has made the environmental impact report (Draft) to see Annex 1{Weifang Binhai Petrochemical Company Limited 70 thousand tons / year (discount) liquid sodium cyanide plant tail gas environmental protection comprehensive utilization project consultation draft}, so that the public can query; the public can also borrow the construction unit or EIA unit to borrow the project environmental impact report (Draft).

Four. The scope of public consultation.

They are mainly residents and other stakeholders in the surrounding area of the project.

Five. The network connection of the public opinion list.

The public can obtain the public opinion form through annex 2 (public opinion table of Weifang Binhai Petrochemical Co., Ltd. 70 thousand tons / year (waste 100) liquid sodium cyanide plant tail gas environmental protection comprehensive utilization project.

Six, ways and means of public opinion.

The public can submit opinions or advice to the construction unit through telephone, letter, e-mail or directly to the work unit. The contact is as follows:

Construction unit: Weifang Binhai Petrochemical Co., Ltd.

Contact address: No. 001001, Xiang Jiangxi street, Weifang Binhai Economic Development Zone.

Contact: Xin Bopeng

Contact: 13561437885

Seven, the starting and ending time of public opinion.

There are 10 working days from the date of public announcement, that is, January 2, 2020 to January 16, 2020.

Public announcement: Weifang Binhai Petrochemical Co., Ltd.

Release date: 2012.1.2

Annex 1: Publicity report on comprehensive utilization of exhaust gas for 70 thousand ton (year 100) liquid sodium cyanide plant

Annex 2: Public opinion list of environmental impact assessment for construction projects

 

 
亿电竞 Holdings Limited Copyright (C) 2016 network support China Chemical Network Global chemical network Copyright statement Contact number: 0536-2103200
Record number: Lu ICP 15001174. Public security record No. 37079202000008